Food Processing (Manufacturing) Industry Prototype Facility Annual Operating Costs |
|
Metro Area | Electric Power Costs |
Hazleton/Wilkes-Barre/Scranton, PA | $495,444 |
Philadelphia, PA | $422,412 |
Lancaster County, PA | $495,444 |
Allentown/Bethlehem, PA | $495,444 |
Poughkeepsie/Hudson Valley, NY | $519,252 |
Long Island, NY | $796,754 |
Newark/North Jersey, NJ | $702,120 |
Camden/South Jersey, NJ | $702,120 |
Boston, MA | $998,868 |
Baltimore, MD | $819,754 |
Chicago, IL | $627,156 |
Food Processing Electric Power Costs
Food Processing (Manufacturing) Industry Prototype FacilityAnnual Operating Costs Metro Area Electric Power Costs Hazleton/Wilkes-Barre/Scranton, PA $495,444 Philadelphia, PA $422,412 Lancaster County, PA $495,444 Allentown/Bethlehem, PA $495,444 Poughkeepsie/Hudson Valley, NY $519,252 Long Island, NY $796,754 Newark/North Jersey, NJ $702,120 Camden/South Jersey, NJ $702,120 Boston, MA $998,868 Baltimore, MD $819,754 Chicago, IL $627,156