Browse Properties

Whatever your needs, we have the right property for your business.

500 West Timberline Drive Hazle Township

500 West Timberline Drive Hazle Township
  • Buildings

Building Size (SF): 140, 400

Property Details

General Building Information

Building Size (SF) 140,400
Available SF 140,400
Configuration Cross Dock

Construction and Structure

Floor Slab 7"
Wall Construction Reinforced Tilt-Wall

Building Dimensions & Column Spacing

Dimensions 540' x 260'
Column Spacing 50' x 52'
Speed Bay 70'

Ceiling Height / Clear Height

Minimum Clear Height 40'

Dock & Drive-In Doors

Dock Doors 10
Drie-In Doors 2

Sprinklers / Fire Protection

System Type ESFR

Lighting

Lighting Type LED @ 30 FC

Parking (Car & Trailer)

Car Parking TBD
Trailer Parking 20

Humboldt Industrial Park Northwest

Developed by CAN DO, Inc. in 1970, Humboldt Industrial Park opened. Humboldt Park is a well-established industrial development stretching five miles along PA State Route 924. Located off Exit 143 of Interstate 81 and only minutes from the interchange of Interstate 80, Humboldt is within a 300-mile radius of 25% the population and total production of the entire nation.

View Park